Created by Ronald S. Burkey <info@sandroid.org>
Last updated 12/19/2003.
The “Designations” listed below are M.I.T./Instrumentation Laboratory document numbers, where available.
The “Page Counts” listed below are sometimes exact, but at other times are only rough estimations because the documents themselves didn't always include the page counts in an easily usable form. I thought it was useful to guesstimate the page counts so that anyone who wanted copies of the documents could more easily estimate the time/expense involved.
My (Ron Burkey's) comments are marked with the notation “RSB”.
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
- |
Declassification of E.209G |
- |
April 1970 |
1 |
- |
Documentation Status Report No. 2 |
- |
July 1962 |
60 |
- |
Documentation Status Report No. 4 |
- |
February 1963 |
50 |
- |
Documentation Status Report No. 5 |
- |
March 1963 |
50 |
- |
Documentation Status Report No. 6 |
- |
April 1963 |
50 |
- |
Documentation Status Report No. 8 |
- |
September 1963 |
100 |
- |
Apollo G&N Documentation Status Report No. 9 |
- |
October 1963 |
250 |
- |
Apollo G&N Documentation Status Report No. 11 |
- |
December 1963 |
200 |
- |
Apollo G&N Documentation Status Report No. 12 |
- |
January 1964 |
250 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
- |
Documentation Status Report No. 13 |
- |
February 1964 |
150 |
- |
Documentation Status Report No. 14 |
- |
March 1964 |
150 |
- |
Documentation Status Report No. 15 |
- |
April 1964 |
100 |
- |
Documentation Status Report No. 16 |
- |
May 1964 |
100 |
- |
Documentation Status Report No. 17 |
- |
June 1964 |
100 |
- |
Documentation Status Report No. 18 |
- |
July 1964 |
100 |
- |
Documentation Status Report No. 19 |
- |
August 1964 |
100 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
- |
Documentation Status Report No. 20 |
- |
September 1964 |
100 |
- |
Documentation Status Report No. 21 |
- |
October 1964 |
100 |
- |
Documentation Status Report No. 22 |
- |
November 1964 |
100 |
- |
Documentation Status Report No. 23 |
- |
December 1964 |
100 |
- |
Documentation Status Report No. 24 |
- |
January 1965 |
100 |
- |
Documentation Status Report No. 25 |
- |
February 1965 |
100 |
- |
Documentation Status Report No. 27 |
- |
April 1965 |
100 |
- |
Documentation Status Report No. 28 |
- |
May 1965 |
100 |
- |
Documentation Status Report No. 30 |
- |
July 1965 |
100 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
- |
Proposed Apollo Guidance and Control Statement of Work |
- |
December 1964 |
150 |
E-965 |
A Sunfinder for an Interplanetary Vehicle, rev. A |
Harold H. Seward |
December 1960 |
27 |
E-1054 |
Analysis of the PNP-NPN Latch Circuit |
Joseph Rocchio |
September 1961 |
30 |
E-1067 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
August-September 1961 |
50 |
E-1068 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
September-October 1961 |
70 |
E-1074 |
Erasable Ferrite Memory Mod 3C Computer |
D. Shansky |
October 1961 |
15 |
E-1077 |
Preliminary Mod 3C Programmers Manual |
R. Alonso, J. H. Laning, Jr., and H. Blair-Smith |
November 1961 |
81 |
E-1078 |
Development Plan, plus corrections |
- |
November 1961 |
151 |
E-1087 |
Documentation Plan |
- |
February 1962 |
40 |
E-1087 |
Documentation Handbook (includes the Documentation Plan) |
- |
May 1963 |
150 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
- |
“Special Course of Instruction” for Apollo Guidance and Navigation |
Jerome E. Levy |
January 1964 |
150 |
E-1087 |
Apollo Guidance & Navigation Documentation Handbook, rev. A |
- |
March 1964 |
200 |
E-1087 |
Apollo Guidance & Navigation Documentation Handbook, rev. C |
- |
July 1965 |
200 |
E-1087 |
Apollo Guidance & Navigation Documentation Handbook and Plan, rev. D |
- |
February 1966 |
100 |
E-1087 |
Apollo Guidance & Navigation Documentation Handbook and Plan, rev. E |
- |
October 1966 |
100 |
E-1097 |
Work Statement for Industrial Support, plus Addendum |
- |
January 1962 (Addendum February 1962) |
200 |
E-1099 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
October-November 1961 |
55 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1100 |
Work Statement for the Pulsed Integrating Pendulum (PIP) MODEL D |
M. Sapuppo |
December 1961 |
10 |
E-1101 |
Work Statement for the APOLLOC 25 IRIG |
E. J. Hall |
December 1961 |
10 |
E-1104 |
Preliminary Assembly and Test Manual 16 PIP MOD D |
- |
January 1962 |
10 |
E-1105 |
Computer Displays |
E. C. Hall |
January 1962 |
10 |
E-1113 |
System Identification Data List |
- |
August 1962 |
25 |
E-1116 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
December 1961 |
10 |
E-1117 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
December 1961 through January 1962 |
95 |
E-1118 |
Investigation of Midcourse Maneuver Fuel Requirements for Apollo Spacecraft |
Roger Scholten and Peter Philliou |
March 1962 |
70 |
E-1123 |
System and Component Slide Reprints |
D. Hoag |
February 1962 |
8 |
E-1124 |
Preliminary Study of Aborts from Circumlunar Trajectories |
James S. Miller and John J. Deyst, Jr. |
March 1962 |
35 |
E-1125 |
Preliminary Resolver Angle Measurement |
Ramon L. Alonso |
February 1962 |
25 |
E-1130 |
Maintenance Plan |
- |
March 1962 |
8 |
E-1134 |
Photometric Units in the MKS System |
Arthur C. Hardy |
March 1962 |
10 |
E-1139 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
January-February 1962 |
10 |
E-1140 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
March 1962 |
115 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1142 |
Weight and Balance Report |
- |
March 1962 |
5 |
E-1142 (continued) |
Revs. A, 2-14, and 18-35. At rev. 11, the title changes to “System Status Report” |
- |
Various, through August 1965 |
5-50 each |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1142 (continued) |
Revs. 36-55 |
- |
September 1965 through February 1968 |
50 each |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1142 (continued) |
Revs. 56-61 |
- |
April 1968 through May 1969 |
50 each |
E-1158 |
Erasable Store Mod 3C |
David Shansky |
July 1962 |
34 |
E-1161 |
Technical Directive Procedures for Apollo G and N System Participating Contractors |
Isadore Halzel |
May 1962 |
15 |
E-1167 |
Drawing Standards |
- |
December 1962 |
300 |
E-1167 |
MIT Apollo Drawing Standards, Rev. 1 |
- |
June 1964 |
130 |
E-1168 |
Slide Reprints of Presentation at MSA at Houston to Participating Contractors |
- |
May 1962 |
90 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1172 |
The Visibility of Stars (Calculated from the Tiffany Data) |
Arthur C. Hardy |
June 1962 |
15 |
E-1173 |
The Heat Transfer Properties of Structural Elements for Space Instruments |
Richard M. Jansson |
June 1962 |
20 |
E-1174 |
Slide Reprints Quarterly Management Review Meeting NASA, in Houston |
Perry K. Bryant |
June 1962 |
37 |
E-1177 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
April-May 1962 |
168 |
E-1179 |
Rope Core Tester |
Robert G. Scott |
July 1962 |
31 |
E-1182 |
Launch Vehicle Guidance Study |
- |
May 1962 |
10 |
E-1186 |
Technical Data Release Procedures |
- |
August 1962 |
30 |
E-1186 (continued) |
Revs. 1-6 |
- |
December 1962 through March 1970 |
30-40 each |
E-1195 |
Earth Orbital Rendezvous |
Norman E. Sears |
May 1962 |
54 |
E-1196 |
Analysis of Two Lunar Landing Techniques Providing Direct Landing Site Visibility Prior to Touchdown |
Malcolm W. Johnston |
July 1962 |
25 |
E-1199 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
June 1962 |
28 |
E-1203 |
Calibration Techniques for Precision Rotary Components |
G. A. Davidson and H. H. Seward |
August 1962 |
41 |
E-1206 |
The Blue-White Boundary Horizon Sensor |
H. H. Seward |
September 1962 |
15 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1212 |
IMU Error Data for Apollo Trajectories |
Frederic D. Grant, Jr. |
September 1962 |
115 |
E-1215 |
Thermal Models for High Density Computer Circuit Structures |
T. C. Taylor |
September 1962 |
40 |
E-1233 |
Techniques of Circuit Fabrication with State-of-the-Art, Weldable Multilayer Boards |
Theodore C. Taylor |
October 1962 |
14 |
E-1236 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
June-July 1962 |
83 |
E-1237 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
July-August 1962 |
128 |
E-1238 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
September 1962 |
49 |
E-1253 |
Slide Reprints of Manned Spacecraft Center Guidance System Review at Houston |
C. Stark Draper |
November 1962 |
71 |
E-1256 |
Apollo Midcourse Guidance |
John W. Hursh |
November 1962 |
28 |
E-1258 |
Slide Reprints (Shown to Astronauts at MIT in Cambridge) |
- |
December 1962 |
40 |
E-1285 |
Some Luminance Values for the Sun, Earth, and Moon |
Arthur C. Hardy |
January 1963 |
10 |
E-1287 |
Backup Thrust Vector Control |
John M. Dahlen and James H. Long |
February 1963 |
19 |
E-1288 |
Alignment Errors of the IMU Stable Member |
Frederic D. Grant |
February 1963 |
12 |
E-1293 |
Field Operations Program Plan. (Duplicated from Box 9.) |
Randall T. Boyd, Jr., ed. |
February 1964 |
240 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1293 |
Field Operations Program Plan. (Duplicated from Box 8.) |
Randall T. Boyd, Jr., ed. |
February 1964 |
240 |
E-1293 |
Field Operations Program, Rev. 2 |
L. Wilk |
May 1963 |
200 |
E-1293 |
Field Operations Program, Rev. 11 |
Randall T. Boyd, Jr. |
April 1965 |
180 |
E-1297 |
Inertial Subsystem (ISS) Calibration Tests |
James H. Flanders |
June 1963 |
130 |
E-1302 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
September-October 1962 |
31 |
E-1303 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
October-November 1962 |
36 |
E-1304 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
December 1962 |
4 |
E-1305 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
December 1962 through January 1963 |
49 |
E-1306 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
January-February 1963 |
226 |
E-1307 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
March 1963 |
92 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1308 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
April 1963 |
124 |
E-1313 |
Thermal Grounding Analysis for Circuit Structures |
Theodore C. Taylor |
April 1963 |
29 |
E-1321 |
Gyrocompassing with Integrating Accelerometers |
Raymond B. Harlan |
May 1963 |
54 |
E-1322 |
Apollo Guidance and Navigation Failure Reporting and Corrective Action Plan |
George W. Mayo, ed. |
April 1963 |
75 |
E-1322 |
Apollo Guidance and Navigation Failure Reporting and Corrective Action Plan, Rev. 1 |
George W. Mayo, ed. |
March 1965 |
70 |
E-1330 |
Apollo 16 PIPA Test Console Job Description Cards for Operation and Maintenance |
- |
August 1963 |
80 |
E-1333 |
Cloud Cover Data for Landmark Studies |
Chung L. Pu |
March 1963 |
40 |
E-1342 |
Chapter 5, Computer Subsystem (Prepared by Raytheon) |
- |
September 1963 |
130 |
E-1343 |
Ternary Pulse Torquing |
George Oberbeck |
May 1963 |
12 |
E-1344 |
Consideration of Apollo IMU Gimbal Lock |
David Hoag |
April 1963 |
20 |
E-1350 |
Statistical Decision Theory for Logistics Planning |
Warren G. Briggs |
May 1963 |
41 |
E-1353 |
The Horizon Photometer and Other Earth Parking Orbit Guidance and Navigation Measurements |
Edward Copps, D. Alexander Koso, Kenneth Nordtvedt, and Milton Trageser |
May 1963 |
40 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1363 |
Status of Apollo Flight Safety System Design and Development |
Thomas Heinsheimer |
June 1963 |
30 |
E-1374 |
Propagation of Altitude and Altitude Rate Errors During Suborbital Flight |
Janusz Sciegienny |
June 1963 |
20 |
E-1385 |
Visibility Data and the Use of Optical Aids |
Arthur C. Hardy |
July 1963 |
25 |
E-1386 |
Report on Clear Resins |
Samuel C. Smith |
August 1963 |
12 |
E-1388 |
Summary of Error Propagation in an Inertial System |
Janusz Sciengienny |
August 1963 |
20 |
E-1389 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
June 1963 |
52 |
E-1413 |
Some Reversible and More Permanent Effects of Moisture on the Electrical Characteristics of Germanium Transistors Following Stress |
Jayne Partridge and Arnold J. Borofsky |
September 1963 |
50 |
E-1420 |
On the Extrapolation of Accelerated Stress Conditions to Normal Stress Conditions of Germanium Transistors |
Jayne Partridge |
September 1963 |
35 |
E-1425 |
A Comparison of the Readout Resolutions of the Proportional Elastance vs. Constant Elastance Torque-to-Balance Systems |
Charles C. Perez |
September 1963 |
20 |
E-1429 |
Lunar Orbit Determination by Star Occultations and MSFN Tracking |
David S. Baker, Norman E. Sears, John B. Suomala, and Robert L. White |
September 1963 |
50 |
E-1432 (2 copies) |
GSE Familiarization Manual |
- |
January 1964 |
150 |
E-1432 |
GSE Familiarization Manual, Rev. August 1964 |
- |
August 1964 |
250 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1482 |
Inflight Alignment Errors of the IMU Stable Member |
Frederic D. Grant |
December 1963 |
34 |
E-1492 |
On the Perception of Flashes of Light at the Limit of their Perceptibility |
George A. Davidson and Arthur C. Hardy |
January 1964 |
35 |
E-1494 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
October 1963 |
50 |
E-1495 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
November 1963 |
45 |
E-1496 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
December 1963 |
45 |
E-1524 |
Evaluation of Urethane Foam for Potting |
Samuel C. Smith |
February 1964 |
30 |
E-1534 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
January 1964 |
50 |
E-1539 |
Thermal Properties of Some Structural Members for Space-Borne Computer Assemblies |
Theodore C. Taylor and Thomas A. Zulon |
March 1964 |
40 |
E-1540 |
A Preliminary Study of a Back-Up Manual Navigation Scheme |
Kenneth Nordtvedt |
August 1964 |
25 |
E-1544 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
February 1964 |
50 |
E-1547 |
Optical Equipment Handling Guidelines |
P. Bowditch, A. Koso, and R. Mudgett |
March 1964 |
20 |
E-1548 |
Brazing of Beryllium, Progress Report on DSR Project 9909 |
MIT Department of Metallurgy |
March 1964 |
20 |
E-1551, Volume One |
Functions and Mechanization of the Apollo Guidance and Navigation System: Inertial Subsystem |
R. Larson (ACSP) and A. Klumpp |
August 1964 |
80 |
E-1557 |
Average Power Profiles for Apollo Guidance and Navigation in the Command Module and Lunar Excursion Module |
William Nadler |
April 1964 |
15 |
E-1560 |
A Manual LEM Back-Up Guidance System |
Malcolm W. Johnston |
April 1964 |
30 |
E-1573 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
March 1964 |
318 |
E-1588 |
Apollo G&N Site Activation Plan |
Randall T. Boyd, Jr., and Gerald Hinds |
June 1964 |
20 |
E-1590 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
April 1964 |
90 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1609 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
May 1964 |
62 |
E-1634 |
The Profile of an Exponential Atmosphere Viewed from Outer Space and Consequences for Space Navigation |
Dr. Milo Wolff |
September 1964 |
35 |
E-1639 |
Monthly Progress Report No. 1 on Contract NAS9-3079 Covering July 1964 |
- |
August 1964 |
5 |
E-1650 |
Monthly Progress Report No. 2 on Contract NAS9-3079 Covering August 1964 |
- |
September 1964 |
5 |
E-1663 |
A Manual Abort Guidance Procedure Based on Range and Altitude Measurements |
Allan R. Klumpp |
October 1964 |
45 |
E-1666 |
Quarterly Progress Report Contract NAS9-3079 Covering June 30, 1964 to September 30, 1964 |
- |
September 1964 |
5 |
E-1670 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
June 1964 |
50 |
E-1679 |
Progress Report on Attainable Reliability of Integrated Circuits for Systems Application |
Jayne Partridge, L. David Hanley, and Eldon C. Hall |
November 1964 |
40 |
E-1684 |
Monthly Progress Report No. 3 on Contract NAS9-3079 Covering October 1964 |
- |
November 1964 |
5 |
E-1687 |
An Optical Earth Horizon Profile Based Upon Tabulated Solutions of Chandrasekhar's Equations |
Dr. Milo Wolff |
October 1964 |
40 |
E-1688 |
Sampling Reliability Test Plans with Relatively Small Lot Sizes |
Harry H. Cho |
December 1964 |
50 |
E-1689 |
A Proposed Circuit Structure for Computer Logic Based on Semiconductor Flat Packs Interconnected by Multilayer Circuit Boards |
Theodore C. Taylor |
December 1964 |
30 |
E-1713 |
Combustion of Polyolefin Insulation and Toxicity of Teflon Under Electrical Overloads |
A. O. Mirarchi |
December 1964 |
35 |
E-1717 |
Monthly Progress Report No. 4 on Contract NAS9-3079 Covering November 1964 |
- |
December 1964 |
5 |
E-1718 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
July 1964 |
75 |
E-1727 |
Quarterly Progress Report No. 2 on Contract NAS9-3079 Covering October 1, 1964 through December 31, 1964 |
- |
December 1964 |
5 |
E-1734 |
Brazing of Beryllium, Final Report on DSR Project 9909 |
Prof. Clyde M. Adams, Jr., and Stanley Weiss |
February 1965 |
45 |
E-1740 |
Monthly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
August 1964 |
60 |
E-1749 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
September 1964 |
50 |
E-1750 |
Computer Programs for Optical System Analysis and Design |
Donald C. Dilworth |
February 1965 |
80 |
E-1758 |
Organization of Computation and Control in the Apollo Guidance Computer |
T. J. Lawton and C. A. Muntz |
April 1965 |
25 |
E-1759 |
Gyro Temperature Dependent Drift |
Erich K. Bender |
August 1965 |
35 |
E-1760 |
Performance Monitoring of the PGNS for Unpowered Lunar Orbit Flight Phases |
B. A. Kriegsman and D. S. Millard |
December 1965 |
125 |
E-1761 |
Quarterly Program and Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
December 1964 |
70 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1764 |
Monthly Progress Report No. 6 on Contract NAS9-3079 Covering February 1965 |
- |
March 1965 |
5 |
E-1769 |
Typical Missile and Satellite Radar Tracking Systems |
Walter Tanner |
April 1965 |
40 |
E-1779 |
Quarterly Progress Report No. 3 on Contract NAS9-3079 Covering Jan. 1, 1965 to March 31, 1965 |
- |
March 1965 |
5 |
E-1786 |
Verification Plan for AGC/LGC Programs |
T. J. Lawton and C. A. Muntz |
May 1965 |
15 |
E-1789 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
March 1965 |
90 |
E-1792 |
16 PIP MOD D Centrifuge Tests |
George J. Reichenbacher |
August 1965 |
35 |
E-1800 |
A Sequence of Computer Programs Useful in the Analysis of Feedback Control Systems |
Donald C. Fraser |
May 1965 |
125 |
E-1801 |
Apollo GN&C Equipment Contingency Plan (Apollo Ground Checkout) |
J. D. Fleming, Jr., and R. T. Boyd, Jr. |
February 1966 |
45 |
E-1802 |
Characteristics of Soft Metals for Electrical Connections |
Theodore C. Taylor |
June 1965 |
30 |
E-1803 |
System Analysis of Lunar Landing Radar |
J. Sciegienny |
June 1965 |
70 |
E-1808 |
Rope Memory Module Assembly Processing Procedures |
A. LaPointe |
June 1965 |
30 |
E-1809 |
Coupled Two-Degree-of-Freedom Response of Resiliently Supported Rigid Body to Random Excitation |
G. Dudley Shepard |
December 1965 |
35 |
E-1810 |
Analysis of Landing Radar Geometry During Redesignation of Lunar Landing Site |
J. Sciegienny |
July 1965 |
70 |
E-1815 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
June 1965 |
70 |
E-1819 |
A Lunar Photometric Function: Curves for Calculating the Differential Luminance of the Lunar Surface |
J. Gallagher and J. Hallock |
July 1965 |
65 |
E-1823 |
The Design of Series-Loaded Thermal Conductors for Minimum Weight |
Theodore C. Taylor |
July 1965 |
20 |
E-1828 |
G&N System Data for Mission AS-202 Development Engineering Inspection |
Apollo Staff |
August 1965 |
84 |
E-1832 |
Attitude Maneuver Optimization to Conserve Reaction Control Propellants |
R. Crisp and D. Keene |
August 1965 |
35 |
E-1836 |
Studies of Spacecraft Attitude Change Modes and Resulting Attitude Fuel Consumptions |
Kenneth Nordtvedt |
August 1965 |
35 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1838 |
The Application of Failure Analysis in Procuring and Screening of Integrated Circuits |
L. D. Hanley, J. Partridge, and E. C. Hall |
October 1965 |
50 |
E-1855 |
Pulsed Light Source Simulation of Transient Nuclear Effects in Integrated Circuits |
Harold E. Maurer |
October 1965 |
40 |
E-1859 |
Design Principles for a Multilayer Circuit Board Connector Using Soft Metal Contacts |
Theodore C. Taylor |
October 1965 |
20 |
E-1864 |
Presimulation Report, Apollo Mission 202, Dynamic Simulation Block I |
Madeline Sullivan |
September 1965 |
50 |
E-1872 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
September 1965 |
120 |
E-1877 |
Show-Banksum and Final Block I AGC Selfcheck |
Edwin D. Smally |
November 1965 |
55 |
E-1880 |
A Case History of the AGC Integrated Logic Circuits |
Eldon C. Hall |
December 1965 |
35 |
E-1899 |
Apollo Operations Handbook Guidance & Navigation System Command & Service Module Mission AS-204A, Spacecraft 012 |
- |
June 1966 |
400 |
E-1901 |
Visibility of the LEM with Various Background Luminances |
Kenyon L. Zapf |
January 1966 |
20 |
E-1903 |
PGNS Rendezvous Radar Functional and Performance Specification |
N. E. Sears and L. B. Johnson |
March 1965 |
58 |
E-1904 |
PGNS Landing Radar Functional and Performance Specifications |
N. E. Sears and L. B. Johnson |
February 1965 |
46 |
E-1905 |
Keyboard and Display Program Operation |
Alan I. Green |
January 1966 |
85 |
E-1906 |
Fourier Analysis by the Method of Selected Ordinates |
James N. Hallock |
January 1966 |
95 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1921 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
December 1965 |
100 |
E-1922 |
Mission AS-202, AGC Software Verification. Summary of Results of Digital Simulations |
Albrecht L. Kosmala |
February 1966 |
200 |
E-1923 |
Apollo Mission 202, Dynamic Simulation Block I |
Madeline M. Sullivan and James F. Cutter |
January 1966 |
145 |
E-1926 |
A Design Procedure for Radiation Hardening Certain NOR Gate Logic Circuits |
Harold E. Maurer |
March 1966 |
20 |
E-1937 |
Velocity Errors in Lunar Landing Radar Caused by Digital Processing |
Janusz Sciegienny |
March 1966 |
70 |
E-1942 |
Command Angle Torquing of Gyros in the Apollo Guidance and Navigation System |
Maurice Lanman and Julius Feldman |
April 1966 |
30 |
E-1944 |
The Impact of the Flight Specifications on Semiconductor Failure Rates |
Jayne Partridge and L. David Hanley, Jr. |
June 1967 |
30 |
E-1956 |
An Automated Documentation Technique for Integrating Apollo Crew Procedures and Computer Logic |
J. C. Dunbar, R. A. Larson, and P. T. Augart |
May 1966 |
50 |
E-1958 |
Quarterly Technical Progress Report Project Apollo Guidance and Navigation Program |
- |
March 1966 |
140 |
E-1964 |
Apollo Command and Service Module Reaction Control by the Digital Autopilot |
R. Crisp and D. Keene |
May 1966 |
40 |
E-1970 |
Case History of the Apollo Guidance Computer |
Eldon C. Hall |
June 1966 |
40 |
E-1971 |
Reliability Assessments of Microcircuits and Microelectronic Systems |
Eldon C. Hall |
June 1966 |
75 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-1973 |
Statistical Estimation in Inertial Systems |
Larry D. Brock and George T. Schmidt |
June 1966 |
20 |
E-1974 |
Apollo 16 PIPA Test Console Verification Tests |
David McCabe |
June 1966 |
16 |
E-1975 |
Simulated LEM Inflight IMU Alignment Sightings |
James Wolf |
June 1966 |
50 |
E-1976 |
Radar Interface Evaluation Phase I Final Test Report |
Walter E. Tanner and William Saltzberg |
May 1966 |
70 |
E-1978 |
Block II/LEM Optics Design Evaluation Interim Report |
- |
June 1966 |
85 |
E-1981 |
LEM-PGNCS Guidance Equations for a Nominal Lunar Landing Mission |
N. E. Sears and P. F. Hoffman |
May 1966 |
150 |
E-1982 |
LEM PGNCS and Landing Radar Operations During the Powered Lunar Landings Maneuver |
B. Kriegsman and N. Sears |
August 1966 |
235 |
E-1983 |
Lunar Orbit Navigation Performance with Various Random and Systematic Errors |
D. S. Baker, N. E. Sears, and R. L. White |
July 1966 |
90 |
E-1989 |
Keyboard and Display Program Operation |
Alan I. Green and Robert I. Filene |
July 1966 |
80 |
E-2014 |
Temperature Control of the Apollo Block II Inertial Measurement Unit |
A. H. Arpiarian |
August 1966 |
30 |
E-2026 |
Users' Guide to the AGC Monitor (Core Rope Simulator) |
James D. Wood |
September 1966 |
65 |
E-2031 |
Entry Flight Data for Mission AS-202 |
R. Morth |
October 1966 |
80 |
E-2034 |
LM Alignment Optical Telescope Mechanical Integrity Design Evaluation Final Report |
E. K. Gardner |
September 1966 |
32 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2051 |
Design Evaluation Thermal-Vac Tests Final Report |
W. A. Vachon |
November 1966 |
80 |
E-2052, vol. 1 of 2 |
AGC4 Basic Training Manual |
Bernard I. Savage and Alice Drake |
January 1967 |
105 |
E-2055 |
Data Acquisition and Reduction MIT X-15 Horizon Definition Experiment Phase II |
John Lawson |
December 1966 |
95 |
E-2065, plus Addendum 1 |
Block II AGC Self-Check and Show-Banksum |
Edwin D. Smally |
December 1966 |
66 |
E-2066 |
Hybrid Simulation of the Apollo Guidance Navigation and Control System |
Philip G. Felleman |
December 1966 |
5 |
E-2079 |
Pre-Simulation Report: LM Dynamics Simulation |
J. D. Goetzinger |
September 1966 |
70 |
E-2081 |
Man-Machine Simulations for the Apollo Navigation, Guidance, and Control System |
J. L. Nevins, E. A. Woodin, and R. W. Metzinger |
January 1967 |
20 |
E-2095 |
Evaluation Report on Multilayer Circuit Board Connectors Using the Soft Metal Indium for Electrical Contacts |
Thomas A. Zulon |
March 1967 |
35 |
E-2099 |
Final Report on Erasable Memory Investigations |
D. Shansky |
March 1967 |
35 |
E-2106 |
Pre-Simulation Report Single Axis Block II CSM/TVC |
J. O'Connor |
April 1967 |
40 |
E-2108 |
Rate Table Control Console Instruction Manual |
Stanley Drozd and John Fish |
May 1967 |
15 |
E-2129 |
Keyboard and Display Program and Operation |
Alan I. Green and Robert J. Filene |
June 1967 |
80 |
E-2141 |
Apollo Guidance, Navigation, and Control System Gyro Reliability |
John E. Miller and Julius Feldman |
June 1967 |
45 |
E-2150 |
Guidance, Navigation, and Control Block II Command and Service Module Functional Description and Operation Using Flight Program Sundisk, Rev. I |
- |
July 1968 |
395 |
E-2150 (continued) |
Rev. II |
- |
September 1968 |
100 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2159 |
Computer-Controlled Steering of the Apollo Spacecraft |
Frederick H. Martin and Richard H. Battin |
August 1967 |
15 |
E-2160 |
Verification Results Summary for LGC Sunburst (LM-1 Mission) |
Jay A. Sampson (AC Electronics) |
August 1967 |
105 |
E-2164, Vol. 1, preliminary |
Guidance, Navigation, and Control Lunar Module Functional Description and Operation Using Flight Program Sundance |
- |
July 1968 |
300 |
E-2164, Vol. 2 |
Guidance, Navigation, and Control Lunar Module Functional Description and Operation Using Flight Program Sundance |
- |
July 1968 |
500 |
E-2172 |
Cloud Obscuration of Apollo Landmarks Derived from Meteorological Satellite Observations |
J. Barnes, D. Beren, and A. Glaser (Allied Research Associates, Inc.) |
September 1967 |
140 |
E-2176 |
CSM Earth Orbital Rendezvous Simulations |
E. Muller, P. Kachmar, and N. Sears |
August 1967 |
85 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2185 |
Landing Radar/LGC Interface Experiments. Part II—Flight Test Data Package |
W. E. Tanner, ed. |
September 1967 |
170 |
E-2194 |
Hybrid Simulation of CSM Dynamics for AS-205 |
Joseph T. O'Connor |
October 1967 |
125 |
E-2218 |
Lead Failure Study for the Motorola 1-mil Wedge-Bonded 1006323 Transistor |
William Day and Jayne Partridge |
December 1967 |
15 |
E-2246 |
Computer-Aided Inertial Platform Realignment in Manned Space Flight |
James A. Hand |
May 1968 |
15 |
E-2252 |
Inertial Components, Reliability and Population Statistics |
J. Feldman and R. Cooper |
March 1968 |
45 |
E-2254 |
Auxiliary Memory System Final Report on Phase I |
D. J. Bowler |
April 1968 |
60 |
E-2259, Vol. I |
Guidance Navigation and Control Command Module Functional Description and Operation Using Flight Program Colossus, Revs. 2, 3, 4, 5, and 6. |
- |
December 1968 through June 1969 |
50-100 each |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2259, vol. II |
Guidance, Navigation, and Control Command Module Functional Description and Operation Using Flight Program Colossus |
- |
June 1968 |
940 |
E-2259 (continued) |
Revised for Colossus 1A (Rev. 249) |
- |
January 1969 |
940 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2260, vol. 1 |
Guidance, Navigation, and Control Lunar Module Functional Description and Operation Using Flight Program Luminary |
- |
January 1969 |
545 |
E-2260, vol 1 (continued) |
Rev. I changes |
- |
March 1969 |
234 |
E-2260, vol 1 (continued) |
Rev. II changes |
- |
April 1969 |
538 |
E-2260, vol 1 (continued) |
Rev. III changes |
- |
June 1969 |
100 |
E-2260, vol 1 (continued) |
Rev. IV changes |
- |
June 1969 |
10 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2260, vol. 2 |
Guidance, Navigation, and Control Lunar Module Functional Description and Operation Using Flight Program Luminary |
- |
May 1968 |
500 |
E-2260, vol. 2 (continued) |
Rev. V (for Luminary rev. 116) |
- |
October 1969 |
500 |
E-2262 |
Studies of On-Board Lunar Orbital Navigation with Unknown and Known Landmarks and Some Observations on Non-Linear Effects |
David S. Baker |
August 1968 |
60 |
E-2270 |
LM-Alignment Optical Telescope Thermal-Humidity Integrity Evaluation Report |
Arthur Grossman |
June 1968 |
20 |
E-2274 |
Inertial Components Reliability and Population Statistics Report II |
J. Feldman and R. Cooper |
May 1968 |
60 |
E-2279 |
Prealignment of the 16 PIP MOD D |
George J. Bukow |
February 1968 |
30 |
E-2299 |
Reliability and Quality Assurance Program Plan for Procurement of Apollo IRIG |
- |
June 1968 |
90 |
E-2299 |
Reliability and Quality Assurance Program Plan for Procurement of Apollo IRIG, Rev. 1 (plus Addendum) |
- |
December 1968 (Addendum May 1969) |
90 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2305 |
Man/Machine Allocation in the Apollo Navigation, Guidance, and Control System |
J. L. Nevins, I. S. Johnson, and T. B. Sheridan |
July 1968 |
40 |
E-2307 |
Recovery from Transient Failures of the Apollo Guidance Computer |
Edward M. Copps, Jr. |
August 1968 |
10 |
E-2333 |
Inertial Components Reliability and Population Statistics Report III |
Martin Landey |
December 1968 |
35 |
E-2334 |
The PIPA (Pulsed Integrating Pendulous Accelerometer) |
G. Bukow |
September 1968 |
45 |
E-2345 |
Software Configuration Management Plan |
- |
October 1968 |
70 |
E-2346 |
Abrasive Cutting of Thick-Film Conductors for Hybrid Circuits |
J. B. Nugent and J. S. Palermo |
October 1968 |
15 |
E-2353 |
Digital Autopilot Verification Results: Program Colossus 1 (Rev. 237) |
- |
November 1968 |
130 |
E-2364 |
Inertial Components Reliability and Population Statistics Report IV |
J. Feldman and S. Helfant |
January 1969 |
45 |
E-2370 |
Reliability for the LSI Age |
Jayne Partridge, L. David Hanley, and Arthur C. Metzger |
December 1968 |
30 |
E-2377 |
LM Digital Autopilot Simulation Results Using Program Sundance |
- |
January 1969 |
150 |
E-2389 |
Star/Horizon Measurements for On-Board Spacecraft Navigation |
James A. Hand |
February 1969 |
30 |
E-2394 |
Manual Attitude Control of the Lunar Module |
Robert F. Stengel |
June 1969 |
20 |
E-2396 |
An Horizon Definition Experiment |
Carlton R. Gray |
June 1969 |
15 |
E-2397 |
Apollo Guidance and Control System Flight Experience |
John E. Miller and Ain Laats |
June 1969 |
15 |
E-2401 |
Application of Kalman Filtering Techniques to the Apollo Program |
Richard H. Battin and Gerald M. Levine |
April 1969 |
90 |
E-2404 |
Entry Flight Data from Apollo 7 |
Raymond Morth |
April 1969 |
100 |
E-2405 |
Entry Flight Data from Apollo 8 |
Raymond Morth |
April 1969 |
100 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2406 |
General Questions on Kalman Filtering in Navigation Systems |
George T. Schmidt and Larry D. Brock |
April 1969 |
50 |
E-2409 |
Colossus 2: TVC DAP Simulation Results |
Robert W. Schlundt |
April 1969 |
105 |
E-2411 |
Apollo Navigation, Guidance, and Control Systems: A Progress Report |
David G. Hoag |
April 1969 |
35 |
E-2414 |
Guidance and Navigation Error Analysis for Mission F (Apollo 10) |
F. D. Grant, J. Werner, and E. S. Muller |
May 1969 |
210 |
E-2427 |
Mission G (AS 506/CM 107/LM 5) G&N Error Analysis |
F. D. Grant, B. Kriegsman, E. S. Muller, J. Werner, and R. White |
July 1969 |
250 |
E-2442 |
Guidance, Navigation, and Control Command Module Functional Description and Operation Using Flight Program Colossus 2C (Comanche 67) |
- |
August 1969 |
500 |
E-2450 |
The Minimum-Time Thrust-Vector Control Law in the Apollo Lunar-Module Autopilot |
William S. Widnall |
December 1969 |
20 |
E-2451 |
Operations and Functions of the Apollo Guidance Computer During Rendezvous |
Stephen L. Copps and Joseph A. Saponarro |
November 1969 |
15 |
E-2454 |
Mission H1 (AS 507/CM 108/LM 6) G&N Error Analysis (Apollo 12) |
F. D. Grant, S. B. Helfant, and B. A. Kriegsman |
October 1969 |
105 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2456 |
Apollo Guidance and Navigation Flow Charts: Program Colossus 2C (Comanche 67) |
- |
November 1969 |
2000 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2456 |
Apollo Guidance and Navigation Flow Charts, Rev. 1: Program Colossus 2D (Comanche 72) |
- |
December 1969 |
2000 |
E-2462 |
SIMFAM: Description and Operation |
John F. McKenna, Jr. |
March 1970 |
30 |
E-2463 |
Apollo Guidance Computer Improvement Study |
Donald J. Bowler, et al. |
January 1970 |
120 |
E-2464 |
Stored Program Data Processor Apollo Guidance Computer Study, Final Report |
- |
September 1969 |
70 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2468 |
Guidance and Navigation System Improvement Program (GNSIP), A Final Report |
John Harper, ed. |
December 1969 |
110 |
E-2469 |
Design and Development of Guidance, Navigation, and Control Software for the Apollo Application Program (AAP) “Wet-Workshop” Missions |
- |
April 1970 |
350 |
E-2470 |
Performance of a Doppler Velocity Sensor at High Speed Over Lunar Terrain |
Walter E. Tanner |
January 1970 |
30 |
E-2471 |
Apollo Guidance and Navigation Flow Charts: Program Luminary 1C |
- |
January 1970 |
2000 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2471, vols. I and II |
Apollo Guidance and Navigation Flow Charts, Rev. 2: Program Luminary 1D (rev. 173) |
- |
June 1970 |
2500 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
E-2475 |
A Comprehensive Digital Simulation for the Verification of Apollo Flight Software |
F. K. Glick and S. R. Femino |
January 1970 |
30 |
E-2476 |
Man-Machine Design for the Apollo Navigation, Guidance, and Control System—Revisited: Apollo, a Transition in the Art of Piloting a Vehicle |
J. L. Nevins |
January 1970 |
40 |
E-2477 |
On-Board Management of Future Manned Spacecraft |
Pierre Sarda |
January 1970 |
20 |
E-2479 |
The Impact of LSI (Large-Scale Integration) on System Packaging |
Jacob H. Martin |
January 1970 |
15 |
E-2481 |
Alignment Optimization for Strapdown Systems |
George J. Bukow |
January 1970 |
25 |
E-2482 |
Entry Flight Data from Apollo 12 |
Paul Chin, Jr. |
March 1970 |
110 |
E-2486 |
Fluid Effects in Floated Inertial Instruments |
R. J. Cooper |
January 1970 |
25 |
E-2491 |
Mission H2 (AS 508/CM 109/LM 7) G&N Error Analysis (Apollo 13) |
F. D. Grant, S. B. Helfant, and B. A. Kriegsman |
March 1970 |
110 |
E-2492 |
Demand-Actuated Multiplexing |
J. H. Laning, Jr. |
April 1970 |
10 |
E-2498 |
Lunar Terrain Elevation Measured by Apollo 10 Radar |
Walter E. Tanner |
April 1970 |
15 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-141 |
The M.I.T. 25 IRIG (Inertial Reference Integrating Gyro unit) and the M.I.T. 25 PIG (Pendulous Integrating Gyro unit) |
Lester R. Grohe, Edward J. Hall, Michele S. Sapuppo, and Andrew E. Scoville |
January 1958 |
240 |
R-276 |
Design Principles for a General Control Computer |
R. Alonso and J. H. Laning, Jr. |
April 1960 |
110 |
R-341 |
A Statistical Optimizing Navigation Procedure for Space Flight |
Richard H. Battin |
September 1961 |
40 |
R-341 |
A Statistical Optimizing Navigation Procedure for Space Flight, Revised |
Richard H. Battin |
May 1962 |
45 |
R-342 |
Development Criteria for Space Navigation Gyroscopes |
C. Stark Draper, William G. Denhard, and Milton B. Trageser |
October 1961 |
35 |
R-348 |
Preliminary Specification for Procurement of Apollo Inertial Reference Integrating Gyro |
E. J. Hall, J. Miller, and J. Aronson |
December 1961 |
25 |
R-348 |
Specification for Procurement of Apollo Inertial Reference Integrating Gyro, Rev. A |
E. J. Hall, J. Miller, J. Aronson, and A. Lattanzi |
August 1962 |
35 |
R-349 |
Guidance and Navigation System Reliability Program |
George W. Mayo |
December 1961 |
40 |
R-349 |
Guidance and Navigation System Reliability Program, Rev. A |
George W. Mayo |
September 1962 |
45 |
R-349 |
Guidance and Navigation System Reliability Program, Rev. C |
George W. Mayo |
September 1964 |
90 |
R-349 |
Guidance and Navigation System Reliability Program, Rev. D |
George W. Mayo |
July 1965 |
95 |
R-353 |
Circumlunar Trajectory Calculations |
R. Battin and J. Miller |
April 1962 |
40 |
R-358 |
A Digital Control Computer Developmental Model 1B |
R. L. Alonso, A. I. Green, H. E. Maurer, and R. E. Oleksiak |
April 1962 |
175 |
R-359 |
Specification for Procurement of Inertial Reference Integrating Gyro Mark 45 Mod 2, Rev. A |
Robert A. Booth |
September 1962 |
35 |
R-367 |
A Multirange Precision Torque Measuring Device |
P. J. Gilinson, Jr., C. R. Dauwalter, and J. A. Scoppettuolo |
July 1962 |
80 |
R-368 |
Reliability Handbook for Electronic Designers |
G. W. Mayo, Jr., and E. T. Driscoll |
August 1962 |
50 |
R-372 |
Velocity Steering Studies for the Apollo Mission |
James H. Flanders |
August 1962 |
35 |
R-376 |
Two Impulse Abort Trajectories from Translunar Flight |
Renwick E. Curry |
October 1962 |
105 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-380 |
Development of High Capacity Heat Storage Materials, Phase I—Study of Materials |
Cryo-Therm, Inc. |
July 1962 |
110 |
R-382 |
Universal Formulae for Conic Trajectory Calculations |
Richard H. Battin |
September 1962 |
15 |
R-383 |
Design Review Procedures |
George W. Mayo, Jr. |
September 1962 |
25 |
R-384 |
Requirements of and Index to Design Evaluation, Qualification, and Reliability Test Program for Apollo Guidance and Navigation System |
George W. Mayo, Jr., and A. R. Schweitzer |
March 1963 |
70 |
R-385 |
Inertial Orientation of the Moon |
Richard C. Hutchinson |
October 1962 |
50 |
R-387 |
Orbital Element Variations for a Body in Orbit Around the Moon |
Stephen J. Madden, Jr. |
July 1963 |
45 |
R-388 |
Preliminary Familiarization Manual |
David Hoag and Milton B. Trageser |
December 1962 |
105 |
R-389 |
Requirements of and Index to Design Evaluation, Qualification, and Reliability Test Program for Apollo Guidance and Navigation System |
George W. Mayo, Jr., and A. R. Schweitzer |
March 1963 |
65 |
R-389 |
Requirements of and Index to Design Evaluation, Qualification, and Reliability Test Program for Apollo Guidance and Navigation System, Revs. A, B, and C |
George W. Mayo, Jr., and A. R. Schweitzer (and J. Kent) |
July 1963, March 1964, and June 1965 |
40-85 each |
R-391 |
The Effect of Retro-Rocket Exhaust on Visibility During Lunar Touchdown |
G. Dudley Shepard |
December 1962 |
45 |
R-393 |
Logical Description for the Apollo Guidance Computer (AGC4) |
Albert Hopkins, Ramon Alonso, and Hugh Blair-Smith |
March 1963 |
150 |
R-396 |
Apollo Guidance and Navigation Quality Assurance Plan |
George W. Mayo, Jr., and Edward T. Driscoll |
April 1963 |
115 |
R-396 |
Apollo Guidance and Navigation Quality Assurance Plan, Rev. A |
Edward T. Driscoll |
June 1964 |
135 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-399 |
Design and Checking of Indexing, Volume II—Gear Checking |
Weyman S. Crocker and Ian G. McWilliams |
April 1963 |
30 |
R-404 |
Radar Requirements for Primary Guidance and Navigation Operation |
Apollo Staff |
April 1963 |
50 |
R-405 |
Quarterly Reliability and Quality Assurance Status Report |
Edward T. Driscoll |
April 1963 |
20 |
R-408 |
Design Concepts of the Apollo Guidance Computer |
Albert Hopkins |
June 1963 |
40 |
R-411 |
Apollo Guidance and Navigation—A Problem in Man and Machine Integration |
David G. Hoag |
April 1963 |
20 |
R-412A |
Navigation and Guidance Systems Employing a Gimballess IMU, Revised |
Robert M. Bumstead and Wallace E. Vander Velde |
October 1963 |
20 |
R-415 |
Apollo Reentry Guidance |
D. J. Lickly, H. R. Morth, and B. S. Crawford |
July 1963 |
20 |
R-416 |
The Apollo Guidance Computer |
Ramon L. Alonso and Albert L. Hopkins |
August 1963 |
30 |
R-417 |
A Unified Explicit Technique Performing Orbital Insertion, Soft Landing, and Rendezvous with a Throttleable Rocket-Propelled Space Vehicle |
George W. Cherry |
August 1963 |
25 |
R-417 |
A Class of Unified Explicit Methods for Steering Throttleable and Fixed-Thrust Rockets, Revised |
George W. Cherry |
January 1964 |
45 |
R-429 |
Reliability and Quality Assurance Progress Report |
Edward T. Driscoll |
December 1963 |
80 |
R-434 |
Preliminary Guidance and Navigation Test Plan |
Apollo Staff |
December 1963 |
150 |
R-439 |
Failure, Trouble, and Corrective Action Summary Design Phase, Report #1 |
George Kruszewski |
February 1964 |
25 |
R-440 |
Quarterly Reliability and Quality Assurance Progress Report, Apollo Guidance and Navigation Program, Period Ended December 31, 1963 |
Edward T. Driscoll |
January 1964 |
40 |
R-443 |
Reprints of Presentation to Northeast Executive's Visit at Instrumentation Laboratory |
- |
March 1964 |
150 |
R-445 |
Technical Development Status of Apollo Guidance and Navigation |
Norman E. Sears |
April 1964 |
35 |
R-446, vols. I and II |
Primary G&N System Lunar Orbit Operations |
Norman E. Sears, ed. |
April 1964 |
510 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-447 |
Navigation for the Apollo Program |
J. M. Dahlen and J. L. Nevins |
May 1964 |
45 |
R-451 |
Quarterly Reliability and Quality Assurance Progress Report Apollo Guidance and Navigation Program |
Edward T. Driscoll, ed. |
July 1964 |
65 |
R-456 |
E Guidance—A General Explicit, Optimizing Guidance Law for Rocket-Propelled Spacecraft |
George W. Cherry |
August 1964 |
70 |
R-457 |
Quarterly Reliability and Quality Assurance Progress Report, Period Ended 30 June 1964 |
- |
September 1964 |
95 |
R-462 |
Dissimilar Metals; Compilation of Contacting Interfaces Between G&N Parts, G&N Airborne Equipments (Block I) |
E. T. Ogrodnik |
September 1964 |
45 |
R-464 |
Reliability and Quality Assurance Progress Report |
- |
July 1964 |
30 |
R-466 |
Vibration Effects on Apollo Guidance |
F. D. Grant |
October 1964 |
25 |
R-467 |
The Compleat Sunrise: Being a Description of Program Sunrise (Sunrise 33—NASA DWG #1021102) |
R. Battin, R. Crisp, A. Green, T. J. Lawton, C. A. Muntz, J. Rocchio, and E. Smally |
September 1964 |
135 |
R-472 |
Analytical Techniques for the Estimation of Satellite Position and Velocity |
Mark A. Smith |
July 1964 |
50 |
R-475 |
Monthly Reliability and Quality Assurance Progress Report |
- |
August 1964 |
25 |
R-476 |
Reliability and Quality Assurance Progress Report |
- |
September 1964 |
25 |
R-479 |
A Unified Method of Generating Conic Sections |
William Marscher |
February 1965 |
15 |
R-482 |
A Method of Orbital Navigation Using Optical Sightings to Unknown Landmarks |
Gerald M. Levine |
March 1965 |
20 |
R-489 |
Users Guide to the Block II AGC/LGC Interpreter |
Charles A. Muntz |
April 1965 |
70 |
R-491 |
On Optimal Steering to Achieve “Required Velocity” |
Balraj G. Sokkappa |
April 1965 |
20 |
R-493 |
Quarterly Reliability and Quality Assurance Progress Report (11/1/64-4/30/65) |
G. W. Mayo, Jr. |
June 1965 |
45 |
R-494 |
Apollo Guidance and Navigation Test Data Program Plan |
Nelson Hanover and Joseph D. Fleming, Jr. |
July 1965 |
120 |
R-495 |
Apollo Spacecraft Guidance System (for presentation to the IFAC Symposium, 1965) |
Milton B. Trageser and David G. Hoag |
June 1965 |
80 |
R-496 |
Design Review Procedures |
George W. Mayo, Jr. |
May 1965 |
20 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-498 |
The 'Braid' Transformer Memory |
R. L. Alonso and W. H. Aldrich |
September 1965 |
60 |
R-499 |
Design Principles of the Lunar Excursion Module Digital Autopilot |
George Cherry and Joseph O'Connor |
July 1965 |
85 |
R-500, Vols. 1 and 2 |
Space Navigation and Control |
- |
June 1965 |
300 |
R-503 |
A Block II Digital Lead-Lag Compensation for the Pitch-Yaw Autopilot of the Command and Service Module |
Gilbert Stubbs |
October 1965 |
50 |
R-507, Vol. 1 |
G&N System Operations Plan, Mission AS-204A/205, Rev. 1 |
- |
October 1966 |
1000? |
R-518 |
Final Report LEM Truck Guidance and Navigation Study |
- |
September 1965 |
190 |
R-520 |
Quarterly Reliability and Quality Assurance Progress Report, 5/1/65-7/31/65 |
- |
September 1965 |
40 |
R-524 |
Quarterly Reliability and Quality Assurance Progress Report, 8/1/65-10/31/65 |
- |
December 1965 |
50 |
R-525 |
Hybrid Simulation of the Apollo Guidance and Navigation System |
Madeline M. Sullivan |
December 1965 |
35 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-527, vol. 1 |
Guidance System Operations Plan, AS-206 |
- |
January 1967 |
200 |
R-527, vols. 1 and 2 |
Guidance System Operations Plan LM-1 Using Burst 116 Program, Rev. 2 |
- |
July 1967 |
350 |
R-529 |
Apollo Mission Simulations Utilizing Flight Software and Hardware |
Malcolm W. Johnston |
July 1968 |
80 |
R-531 |
Whole Number Strapdown Computations |
J. C. Pennypacker |
February 1966 |
95 |
R-532, vols. I and II |
Reentry Guidance for Apollo |
Raymond Morth |
January 1966 |
150 |
R-533 |
A Block II TVC Digital Autopilot Compensation for CSM Spacecraft |
Tan C. Lu (NAA/S&ID) |
January 1966 |
50 |
R-537, vol. I |
Guidance System Operations Plan, AS-501 |
- |
December 1966 |
200 |
R-539 |
A Manually Retargeted Automatic Descent and Landing System for LEM |
Allan R. Klumpp |
March 1966 |
45 |
R-539 |
A Manually Retargeted Automatic Landing System for LM, Rev. 1 |
Allan R. Klumpp |
August 1967 |
50 |
R-541 |
The Power Density Spectrum of the Echo from an Airborne Doppler Radar |
Martin Schetzen |
March 1966 |
55 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-547, vol. I |
Guidance System Operations Plan, AS-278: CM GNCS Operations |
- |
October 1966 |
800 |
R-547, vol. II |
Guidance System Operations Plan, AS-278: LM PGNCS Operations |
- |
October 1966 |
650 |
R-547, section 2 |
Guidance System Operations Plan for Manned CM Earth Orbital Missions Using Program Sundisk: Data Links, Rev. 2 |
- |
October 1968 |
150 |
R-547, section 3 |
Guidance System Operations Plan for Manned CM Earth Orbital Missions Using Program Sundisk: CSM Digital Autopilots, Revs. 2 and 3 |
- |
May 1968 and October 1968 |
130 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-557, section 1 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Programs Sundance, Luminary: Pre-Launch |
- |
June 1968 |
50 |
R-557, section 1 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Programs Sundance 306 and Luminary 069: Pre-Launch, Rev. 1 |
- |
December 1968 |
50 |
R-557, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Data Links |
- |
December 1967 |
40 |
R-557, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Data Links, Rev. 1 |
- |
May 1968 |
45 |
R-557, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Data Links, Rev. 2 |
- |
September 1968 |
100 |
R-557, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance (Rev. 306): Data Links, Rev. 3 |
- |
January 1969 |
100 |
R-557, section 3 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Digital Autopilot |
- |
June 1968 |
100 |
R-557, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: PGNCS Operational Modes |
- |
December 1967 |
1200 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-557, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: PGNCS Operational Modes, Rev. 1 |
- |
February 1968 |
20 |
R-557, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Operational Modes, Rev. 2 |
- |
July 1968 |
530 |
R-557, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: PGNCS Operational Modes, Rev. 3 |
- |
January 1969 |
260 |
R-557, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Guidance Equations |
- |
November 1967 |
200 |
R-557, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Guidance Equations, Rev. 1 |
- |
June 1968 |
350 |
R-557, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Guidance Equations, Rev. 2 |
- |
December 1968 |
70 |
R-557, section 6 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Control Data |
- |
December 1967 |
35 |
R-557, section 6 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Control Data, Rev. 1 |
- |
August 1968 |
60 |
R-557, section 6 |
Guidance System Operations Plan for Manned LM Earth Orbital Missions Using Program Sundance: Control Data, Rev. 2 |
- |
November 1968 |
2 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Data Links |
- |
October 1968 |
70 |
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Data Links, Rev. 1 |
- |
December 1968 |
75 |
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Data Links, Rev. 2 |
- |
March 1969 |
125 |
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1A (Rev. 099): Data Links, Rev. 4 |
- |
June 1969 |
125 |
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1B (Rev. 116): Data Links, Rev. 5 |
- |
August 1969 |
120 |
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1B (Rev. 116): Data Links, Rev. 6 |
- |
October 1969 |
50 |
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1C (Rev. 130): Data Links, Rev. 7 |
- |
November 1969 |
125 |
R-567, section 2 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1C (Rev. 131): Data Links, Rev. 8 |
- |
March 1970 |
100 |
R-567, section 3 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Digital Autopilot |
- |
December 1968 |
100 |
R-567, section 3 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Digital Autopilot, Rev. 1 |
- |
June 1969 |
120 |
R-567, section 3 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Digital Autopilot, Rev. 3 |
- |
October 1969 |
140 |
R-567, sections 2, 4, 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1D, Rev. 8 |
- |
January 1970 |
60 |
R-567, sections 2, 3, 4, 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1D, Rev. 8 (Rev. 4 for section 3) |
- |
February 1970 |
60 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: PGNCS Operational Modes |
- |
March 1968 |
1200 |
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1 (Rev. 069): PGNCS Operational Modes, Rev. 1 |
- |
January 1969 |
1200 |
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1A: PGNCS Operational Modes, Rev. 2 (Supplement to Luminary 1 Rev. 069) |
- |
February 1969 |
70 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1A (Rev. 097): PGNCS Operational Modes, Rev. 3 |
- |
April 1969 |
200 |
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1A (Rev. 099): PGNCS Operational Modes, Rev. 4 |
- |
June 1969 |
500 |
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1B: PGNCS Operational Modes, Rev. 5 |
- |
August 1969 |
1500 |
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1B (Rev. 116): PGNCS Operational Modes, Rev. 6 |
- |
September 1969 |
100 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-567, section 4 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1C (Rev. 131): PGNCS Operational Modes, Rev. 7 |
- |
December 1969 |
1450 |
R-567, section 5 |
Guidance System Operations Plan for Manned LM Lunar Missions Using Program Luminary: Guidance Equations |
- |
January 1967 |
400 |
R-567, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Guidance Equations, Rev. 1 |
- |
November 1968 |
400 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-567, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary (Rev. 069): Guidance Equations, Rev. 2 |
- |
April 1969 |
700 |
R-567, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1A (Rev. 099): Guidance Equations, Rev. 4 |
- |
June 1969 |
400 |
R-567, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1B: Guidance Equations, Rev. 5 |
- |
August 1969 |
500 |
R-567, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1B (Rev. 116): Guidance Equations, Rev. 6 |
- |
October 1969 |
20 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-567, section 5 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary 1C (Rev. 130): Guidance Equations, Rev. 7 |
- |
November 1969 |
500 |
R-567, section 6 |
Guidance System Operations Plan for Manned LM Earth Orbital and Lunar Missions Using Program Luminary: Control Data |
- |
November 1968 |
80 |
R-568 |
Gyro Reliability—Achieved Through Proper Design and Effective Performance Monitoring |
Edward J. Hall |
March 1967 |
55 |
R-577, section 1 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus: Prelaunch |
- |
July 1968 |
55 |
R-577, section 1 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 1 (Rev. 237): Prelaunch, Rev. 1 |
- |
October 1968 |
55 |
R-577, section 1 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2 (Comanche Rev. 44 & 45) or Colossus 2A (Comanche Rev. 51): Prelaunch, Rev. 1 |
- |
October 1968, reissued April 1969 |
2 |
R-577, section 1 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2E: Prelaunch, Rev. 2 |
- |
January 1970 |
55 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus: Data Links, Rev. 1 |
- |
June 1968 |
60 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 1 (Rev. 237): Data Links, Rev. 2 |
- |
November 1968 |
125 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2 (Comanche Rev. 44, 45): Data Links, Rev. 2 |
- |
March 1969 |
125 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2 (MANCHE45,2 rev. 2): Data Links, Rev. 1 |
- |
June 1969 |
125 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2C (Comanche Rev. 67): Data Links, Rev. 6 |
- |
July 1969 |
125 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2C (Comanche Rev. 67): Data Links, Rev. 7 |
- |
September 1969 |
125 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2D (Comanche Rev. 72): Data Links, Rev. 8 |
- |
November 1969 |
125 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2D (MANCHE72 Rev. 3): Data Links, Rev. 9 |
- |
December 1969 |
20 |
R-577, section 2 |
Guidance System Operations Plan for Manned Earth Orbital or Lunar Missions Using Program Colossus 2E: Data Links, Rev. 10 |
- |
March 1970 |
125 |
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus: Digital Autopilots |
- |
April 1968 |
150 |
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus: Digital Autopilots, Rev. 1 |
- |
June 1968 |
200 |
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 1 (Rev. 237): Digital Autopilots, Rev. 2 |
- |
November 1968 |
200 |
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2 (Comanche Rev. 44): Digital Autopilots, Rev. 4 |
- |
February 1969 |
200 |
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2 (MANCHE45) and 2A (Comanche Rev. 55): Digital Autopilots, Revs. 5 and 6 |
- |
April 1969 |
50 |
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2C (Comanche Rev. 67): Digital Autopilots, Rev. 7 |
- |
August 1969 |
200 |
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2D: Digital Autopilots, Rev. 8 |
- |
October 1969 |
10 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-577, section 3 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2E: Digital Autopilots, Rev. 10 |
- |
February 1970 |
300 |
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus: GNCS Operational Modes, Rev. 1 |
- |
April 1968 |
800 |
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 1 (Rev. 237): GNCS Operational Modes, Rev. 5 |
- |
December 1968 |
1000 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2 (Comanche Rev. 44, 45): GNCS Operational Modes, Rev. 7 |
- |
March 1969 |
1200 |
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2 (MANCHE45, Rev. 2): GNCS Operational Modes, Rev. 8 |
- |
June 1969 |
1200 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2A (Comanche 55): GNCS Operational Modes, Rev. 9 |
- |
June 1969 |
1400 |
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2C (Comanche 67): GNCS Operational Modes, Rev. 10 |
- |
August 1969 |
1400 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2D (Comanche 72): Operational Modes, Rev. 11 |
- |
December 1969 |
1400 |
R-577, section 4 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2E: Operational Modes, Rev. 12 |
- |
March 1970 |
200 |
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus: Guidance Equations |
- |
December 1967 |
500 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus: Guidance Equations, Rev. 1 |
- |
May 1968 |
400 |
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus: Guidance Equations, Rev. 2 |
- |
July 1968 |
150 |
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 1 (Rev. 237): Guidance Equations, Rev. 3 |
- |
November 1968 |
400 |
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2 (Comanche Rev. 44, 45): Guidance Equations, Rev. 5 |
- |
March 1969 |
400 |
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2 (MANCHE45 rev. 2) and 2A (Comanche, rev. 55): Guidance Equations, Revs. 6 and 7 |
- |
April 1969 |
30 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2C (Comanche 67): Guidance Equations, Rev. 8 |
- |
July 1969 |
400 |
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2D (Comanche 72): Guidance Equations, Rev. 9 |
- |
November 1969 |
400 |
R-577, section 5 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 2E: Guidance Equations, Rev. 10 |
- |
March 1970 |
400 |
R-577, section 6 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus: Control Data |
- |
June 1968 |
80 |
R-577, section 6 |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 1 (Rev. 237): Control Data, Rev. 1 |
- |
December 1968 |
25 |
R-577, all sections |
Guidance System Operations Plan for Manned Earth Orbital and Lunar Missions Using Program Colossus 1 (Rev. 237) and 1A (Rev. 249): Control Data, Rev. 1 (sections 1&6), Rev. 2 (section 2), Rev. 3 (section 3), Rev. 4 (section 5), Rev. 6 (section 4) |
- |
December 1968 |
200 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-596, vol. 4 |
AS-205 Verification Results Program Sundisk: Digital Autopilot Test Results |
- |
February 1968 |
335 |
R-597 |
Fluctuation Errors of Doppler Sensors at Low Velocities |
Walter Tanner |
May 1970 |
40 |
R-599 |
Digital Simulation Manual |
Pieter Mimno |
January 1968 |
100 |
R-618 |
A New Solution for Lambert's Problem |
Richard H. Battin |
August 1968 |
15 |
R-634 |
Apollo Applications Program Final Report on Tasks 1 Through 8 |
M. Edward Womble, James Deckert, and Alexander Penchuck |
February 1969 |
400 |
R-648 |
MIT/IL X-15 Horizon Definition Experiment, Final Report |
Carlton R. Gray |
October 1969 |
250 |
R-656 |
On the Formal Description of Polarization Optics |
Cynthia K. Whitney |
May 1970 |
90 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
R-659 |
A Fault-Tolerant Information Processing System for Advanced Control, Guidance, and Navigation |
- |
May 1970 |
160 |
R-670 |
A Digital Autopilot for Thrust Vector Control of the Apollo CSM and CSM/LM Vehicles |
G. Stubbs, A. Penchuk, and R. Schlundt |
November 1969 |
70 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
T-297 |
Star Occultation Measurements as an Aid to Navigation in CIS-Lunar Space |
Roy Vincent Keenan and John Donald Regenhardt |
May 1962 |
85 |
T-298 |
Optimum Statistical Operations with Celestial Fix Data for Interplanetary Navigation |
D. R. Scott, C. J. Januska, and R. E. Willes |
May 1962 |
185 |
T-299 |
Optimization of Interplanetary Mid-Course Velocity Corrections |
Mack Mauldin, Jr., and Robert G. Millard |
May 1962 |
60 |
T-300 |
Theoretical Analysis of Gimballess Inertial Reference Equipment Using Delta-Modulated Instruments |
Thomas Freud Wiener |
March 1962 |
165 |
T-327 |
An Improved Technique for Measuring the True RMS Stability of a Sinusoidal Waveform |
Glenn Francis Cushman |
October 1962 |
100 |
T-344 |
The Effects of Lubrication Oil Deposition on Optical Systems in Vacua |
William A. Vachon |
June 1963 |
40 |
T-385 |
Human Performance During a Simulated Apollo Mid-Course Navigation Sighting |
Charles M. Duke, Jr., and Michael S. Jones |
June 1964 |
50 |
T-401 |
A Star Tracker Scanning Mechanism |
Wayne Michael Gifford |
June 1965 |
55 |
T-418 |
Establishing Initial Attitude Conditions in a Gimballess Inertial Navigation System |
John Edward Bortz |
June 1965 |
100 |
T-442 |
A Pulse Restrained Magnetic Suspension |
Michael D. Leis |
January, 1966 |
95 |
T-446 |
On the Design of Nearly Optimal Linear Time-Varying Sampled-Data Stochastic Controllers |
William S. Widnall |
September 1966 |
210 |
T-462 |
A Method of Determining a Satellite's Position and Velocity by Tracking Unknown Landmarks |
Cannon Matthews |
June 1966 |
60 |
Designation |
Title |
Author(s) |
Date |
Page Count |
---|---|---|---|---|
RE-17 |
Optimization of Midcourse Velocity Corrections |
Robert G. Stern and James E. Potter |
November 1965 |
15 |
- |
Reprints of Technical Presentations, Critical Design Review |
- |
December 1965 |
450 |
MC-1500 |
Assembly and Test Manual 16 Pulsed Integrating Pendulum (16 PIP), Mod D |
- |
April 1963 |
186 |
T-421 |
System Test Determination of Apollo IRIG Drift Coefficients |
George Thomas Schmidt |
June 1965 |
75 |
- |
(Apparent PIP graphical data for presentations) |
- |
April 1963/May 1964 |
10 |
PS6015000 |
Performance/Design and Product Configuration Requirements: Primary Guidance, Navigation, and Control System for Lunar Excursion Module, Rev. A |
- |
October 1965 |
60 |
PS2015000 |
Performance/Design and Product Configuration Requirements: Airborne Guidance and Navigation Equipment—Block II for Apollo Command Module |
- |
November 1965 |
66 |
1Yes, revision 2 precedes revision 1—RSB
2Yes, it really says “MANCHE45”—RSB